At FTCPL, we understand that installing a cleanroom is critical and should be executed with minimal downtime or disruption. Hence, our team follows a thorough and precise installation process. Our installers are highly trained to adhere to specific project and ISO requirements.
We also ensure a high level of safety and oversee each installation site. Our goal is to deliver a complete operational modular cleanroom, so your operations stay on track with minimal interruption.
Our installations are carried out by Fabtech-certified technicians who are thoroughly trained in cleanroom protocols and regulatory standards. Their expertise ensures ongoing precision, safety, and efficiency throughout the installation process.
We deploy our proprietary Clean Process Protocol (CPP) to minimize contamination risks and accelerate commissioning. This protocol ensures strict site cleanliness both before and during assembly, setting the stage for faster validation.
Stepwise Modular Installation Approach
This modular method significantly shortens installation timelines, often reducing durations from weeks to just days, depending on the project’s scale and complexity.
Post-installation, our teams perform thorough Installation Qualification (IQ) and Site Acceptance Testing (SAT), including:
These procedures lay the groundwork for Operational Qualification (OQ), ensuring your cleanroom achieves the required ISO classification and all project-specific performance standards before final handover.