Double-leaf cleanroom door set in a panelled partition at the Bosch facility, Nashik

Electronics and precision assembly

Bosch, Nashik

Not every factory needs to become a cleanroom. Sometimes one process does, and the sensible answer is to build a clean room inside the building you already have, rather than reclassify the whole hall around it.

At a glance

The project record

What we are able to publish about this site. Anything held is marked as held rather than left blank, so the gaps are legible.

Client
Bosch
Location
Nashik, Maharashtra
Room types
Cleanroom halls and a self-contained enclosure within a production hall
Scope and classification
Held under the client's disclosure permissions
On site

Photography from the finished project

Photography from the finished areas. Two ideas run through the set: the full-height cleanroom halls, and the enclosure built as a room within the wider hall.

Cleanroom hall with flush partitions, vision panels and recessed ceiling lighting
Double-leaf stainless steel cleanroom door set in a panelled partition
Production corridor lined with equipment beside a glazed cleanroom partition
Cleanroom hall with vision panels along the partition and a high-gloss floor
Self-contained modular cleanroom enclosure standing inside a larger production hall
The brief

What a precision assembly cleanroom has to do

The clean envelope is drawn around the process, not the building. Everything else about the design follows from where you put that line.

Protect small, tolerance-sensitive parts from particles and from static, in a building that is also doing other things. Electronics contamination is unforgiving in a way that is easy to underestimate: a particle far too small to see can sit across a contact or under a component and the failure does not appear on the line at all. It appears in the field, months later, in somebody else's product.

Cleanliness is classified under ISO 14644 by airborne particle count, and for electronics the sizes that matter are usually the small end of the range, which puts the work into filtration and air change rather than into gowning theatre. Supply is HEPA-filtered at the ceiling and the room is held at positive pressure against everything around it, so that leakage always runs outward through door gaps and penetrations. Alongside particles sits the second control that pharma does not have: electrostatic discharge. Static-dissipative flooring, bonded and earthed, plus grounded work surfaces, keep charge from building on people and trolleys and discharging into a component. Where only one process needs the class, a self-contained modular enclosure carries its own filtration, pressure and finish inside the wider hall, which keeps the conditioned volume and its running cost proportionate to the process that actually needs it.

A modular cleanroom enclosure built inside the wider production hall at Bosch, Nashik

A room within a room. The clean envelope wraps the process that needs it, on its own frame, inside a hall that carries on being a hall.

Scope

How Fabtech delivered it

In an operating factory the constraint is rarely the design, it is the shutdown. Sequencing the build around production is part of the scope, not a favour.

01

Design

Where the clean envelope stops, how people and parts cross the boundary, and what pressure regime holds it. On a live plant that boundary is drawn around the process, not around the building.

02

Modular build

Panel partitions, glazed vision panels and stainless door sets, built dry and installed in sequence so the hall around them keeps running while the room goes up.

03

Filtration and pressure

Terminal HEPA filtration at the ceiling and a positive cascade against the surrounding hall, so the room is defended by its own air rather than by its doors being shut.

04

Entry control

Air showers and pass boxes at the boundary, so that people are stripped of loose particulate on the way in and material crosses without the door to the clean side ever opening on the dirty side.

Disclosure

What is not on this page

The classification, the process and the area of these rooms are the client's information and stay with the client. If you are weighing a full-hall cleanroom against an enclosure around one process, that is a costing question as much as an engineering one, and we can work it through with you on your own layout.

Ask for a comparable reference
More projects

Other rooms we have delivered

Each of these is a different room type doing a different job. The engineering is what carries across, not the sector.

FAQ

Questions about this project

A turnkey cleanroom project: design, modular partitions and door sets, terminal HEPA filtration and pressure control, including a self-contained cleanroom enclosure built inside the wider production hall.

Turnkey cleanroom services

Request a quote

Tell us about your cleanroom

Share your industry, ISO class and floor area. Our engineers respond with a scoped proposal, not a brochure.

Based in Andheri (West), Mumbai
Delivering cleanroom projects across India.

We use the details you enter here only to answer your enquiry and prepare a scoped response. You can withdraw consent or ask us to erase them at any time, and you may complain to the Data Protection Board of India. See our Privacy Policy.